联合支护在巷道断层破碎带的应用  被引量:6

Application of Combined Supporting Scheme in the Fault Fracture Zone of Roadway

在线阅读下载全文

作  者:冯长飞 齐杰 

机构地区:[1]河北钢铁集团矿业有限公司田兴铁矿

出  处:《现代矿业》2015年第10期158-160,165,共4页Modern Mining

摘  要:田兴铁矿大贾庄进风井-450 m沿脉巷穿过F10断层破碎带,探孔长探40 m,涌水量达到75 m3/h,且钻进过程卡钻严重。为防止掘进过程中出现大涌水,采用工作面预注浆技术,在巷道周边形成帷幕,封堵涌水并加固围岩。试掘后工作面顶板出现冒落,采用超前管棚、钢拱架、锚喷网3种方式联合支护,取得了较好的效果,顺利通过断层破碎带。The -450 m strike drift of Dajiazhuang shaft in Tianxin iron mine gets through the F10 fault fracture zone,the drilling hole depth is 40 m,the quantity of water gushing is 75 m3 /h,the sticking phenomenon is serious in the process of drilling.In order to deal with the water gushing in the process of tunneling,the working face pre-grouting technology is adopted to form the curtain around the roadway so as to seal the water gushing and reinforce the surrounding rock.The phenomenon of roof caving of work-ing face is appeared after pre-tunneling,the combined supporting scheme based on the advance tubing shield,steel arch shelf and rock bolt-net-shotcreting is adopted to get through the fault fracture zone suc-cessfully,and the good effect is obtained.

关 键 词:断层破碎带 工作面预注浆 超前管棚支护 钢拱架支护 锚网喷支护 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象