浅谈高墩滑框倒模施工技术  

Construction Technology of Concrete Modeling by Sliding Basket for the High Pier Bridge

在线阅读下载全文

作  者:吴敦彬 

机构地区:[1]中铁六局路桥公司,晋中030600

出  处:《价值工程》2015年第35期121-124,共4页Value Engineering

摘  要:随着公路桥梁建设事业的飞速发展。如今桥梁结构日趋复杂,高墩柱桥梁屡见不鲜。本文对高墩柱桥梁墩柱滑框倒模的结构设计及荷载计算做了详述,对高墩柱桥梁滑框倒模模板翻升定位措施做简单介绍,结合项目施工实践对施工中质量控制要点和保障措施做了总结。旨在提高今后滑框倒模施工的施工技术。Nowadays, with the rapid development of highway bridge construction, bridge structures are becoming complicate increasingly, especially the high pier bridges which are very common. In this paper, structure design and load calculation of concrete modeling by sliding basket for the high pier bridge are introduced in detail,but the template turn up and location are just introduced briefly.according to the project construction practice, this paper summarizes the key points of quality control and safeguard measures in order to improve the construction technology of concrete modeling by sliding basket in the future.

关 键 词:桥梁 高墩柱 滑框倒模 模板翻升定位 倒模组成 

分 类 号:U213.1[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象