出 处:《人民长江》2015年第21期68-70,97,共4页Yangtze River
摘 要:大部分碾压混凝土坝存在渗漏缺陷问题,在长期高水头作用下,渗漏易危及大坝安全。江西山口岩碾压混凝土双曲拱坝最大坝高99.1 m,水库初期蓄水时发现浇筑层之间存在较严重的渗漏现象,通过对渗漏原因的分析,并结合防渗施工和水库用水要求,决定水面以上(168 m高程)坝体采用新型环保防水材料聚脲进行喷涂,水下坝体采用搭接帷幕灌浆进行处理。防渗处理施工成后的渗漏量监测结果满足设计要求。简要介绍了施工过程,其渗漏处理方案可以供同类工程参考。Most RCC dams have seepage problems that would threaten the dam safety under long period of high water impound- ment. The largest height of Shankouyan RCC double -curvature dam, Jiangxi Province, is 99. lm, and there were severe pervi- ous problems at roller layers in initial impoundment process. By analyzing the seepage causes and in combination with demands of anti - seepage construction as well as the reservoir operation, we decided to carry out water - proof coating on the water - above dam surface with new environment -friendly material of polyurea, and to adopt overlapping curtain grouting to reinforce the un- derwater dam body. After the anti - seepage reinforcement, the monitoring shows that the seepage volume meets the related re- quirements. The construction process is presented, which could provide reference for similar anti - seepage reinforcements.
分 类 号:TV642[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3