检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水北方勘测设计研究有限责任公司 [2]天津市水务工程建设管理中心
出 处:《水利水电工程设计》2015年第4期1-2,5,共3页Design of Water Resources & Hydroelectric Engineering
摘 要:戈兰滩水电站位于云南普洱市和红河州的界河李仙江上,该地区为极多雨地区,覆盖层厚,谷岭高差最大超过650 m。两岸地形坡度一般为35°~40°,局部超过45°。工程开挖形成左、右坝肩和厂房后边坡3个工程高边坡区,施工过程中又形成了左岸绕坝路和右6~#路2个塌滑体。戈兰滩水电站设计中针对不同类型的高边坡特点,因地制宜地采取工程措施,可供类似工程借鉴。Gelantan Hydropower Station is located on Lixianjiang River,boundary river of Yunnan Pu'er City and Honghe Autonomous Prefecture.It is a rainy area with thick overburden,the biggest height difference of valley ridge is over 650 m.The gradient of terrain on both sides of the slope is generally 35o-40°,locally over 45°.Engineering excavation forms three high slope areas of left and right abutments and powerhouse back slope,and two landslide of left bank dam around road and right side 6~# road.Subject to different types of high slope,engineering measures are taken according to the local conditions so as to provide reference for similar projects.
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.89.150