出 处:《建井技术》2015年第5期10-14,共5页Mine Construction Technology
摘 要:宋新庄煤矿回风斜井倾角22°,净断面16.3m2,斜长1 465m。井筒掘进至283.4m处时,突遇层厚8.3m、斜长22m的泥流砂层,涌水量15m3/h,采用常规方法处理,未能奏效,工程被迫停工。根据具体情况,经方案比选,确定采用化学注浆技术进行治理。即在工作面,向流砂层预注化学浆液,进行堵水加固;结合超前支护、短段掘支、强支撑、勤量测等技术措施进行施工。方案实施后,安全顺利地通过了含水流砂层段,收到了预期效果。A mine air returning inclined shaft of Songxinzhuang Mine had an inclination of 22° ,a net cross section of 16.3 m2 and an inclined length of 1 465 m.When the mine inclined shaft was headed at length of 283.4 m ,a quicksand stratum with a thickness of 8.3 m and a inclined length of 22 m was suddenly occurred.A water inflow of 15 m3/h was come from the quicksand stratum ,a conventional method was applied to the handling with no effect and the project construction had to stop.According to the certain condition ,with a comparison of the plans ,a chemical grouting technology was deter-mined and applied to the handling of the quicksand stratum. The chemical grout was pre-grouted into the quicksand stratum at the mine inclined shaft heading face and then a water sealing and reinforce-ment were conducted. The combination of the pilot support ,short sectional heading and support ,pow-erful support ,frequent measurements and other technical measures was conducted for the construc-tion. After the plan was implemented ,the mine inclined shaft was safely and successfully passed through the section of the water bearing quicksand stratum with an expected effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.61.107