检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:贠东风[1,2] 孟晓军[1] 程文东[1] 苏普正[1,2] 周翔 王东方
机构地区:[1]西安科技大学能源学院,陕西西安710054 [2]教育部西部矿井开采及灾害防治重点实验室,陕西西安710054 [3]华亭煤业集团有限责任公司东峡煤矿,甘肃华亭744100
出 处:《煤矿安全》2015年第11期139-142,共4页Safety in Coal Mines
摘 要:东峡煤矿37220-2工作面存在煤层倾角大、厚度大等复杂地质条件,工作面切眼施工、支护难度较大,采用反井钻机导孔与倾斜段切眼扩掘工艺试验及高强度锚网索辅以抬棚联合支护方式。结果表明:该施工技术效率高、安全可靠、劳动强度低、工程质量好,且支护效果可靠,实现了工作面的快速安全贯通。Because of large dip angle and large thickness seam at 37220-2 fully mechanized caving face of Dongxia Coal Mine,it’s difficult to carry out open-off cut construction and support. We use raise-boring machine pilot hole with expanding mining process test and high strength anchor wire rope lift shed combined supporting method in inclination section. The result shows that this construction technology has the characters of high efficiency,safety and reliability,low labor intensity,good engineering quality and reliable supporting effect. Finally,it achieves safe and fast construction of open-off cut.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43