检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:潘杰[1]
机构地区:[1]江苏省水文水资源勘测局常州分局,江苏常州213000
出 处:《江苏水利》2015年第11期31-33,共3页Jiangsu Water Resources
摘 要:为配合澡港河南枢纽试运行,开展为期7 h的调水试验,研究其调水引流对区域水文情势及水环境的影响。基于布设水量、水质监测断面数据,分析了调水对受水区水位、水量及水质的影响。试验结果表明:南枢纽调水对澡港河以西河道、关河-京杭运河上段的影响较大,而对下段影响小且水质改善不明显。在此基础上,提出了联合小河水闸或魏村枢纽同步引水的调度优化方案,以最大程度上发挥南枢纽的水环境改善效益。With the commission of south Zaoganghe water contral project,A test about seven hours was performed to investigate the effects of hydrologic regime and water quality at intake area.The water level,water quantity and water quality were analyzed by water quantiy and quality mintoring sections.The results indicate that water diversion has more effects on the area of south Zaogang river and upper section guan river-grand canal of Changzhou,hut does very little to the lower section and its water quality.An optimal water diversion scheme of joining the xiao-he or wet-tun water contral project is proposed to optimize the water quality improvement.
分 类 号:TV12[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.80