检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国南方电网调峰调频发电公司检修试验中心,广东广州511493 [2]中国南方电网调峰调频发电公司惠州蓄能水电厂,广东惠州516100
出 处:《水电站机电技术》2015年第B12期60-62,73,共4页Mechanical & Electrical Technique of Hydropower Station
摘 要:当一次系统故障产生最大短路电流时,为了使保护装置能够正确反应一次系统状况而正确动作,电流互感器的变比误差必须在一定范围内。大型蓄能水电厂发电机保护CT数量多,且CT的规格型号也不一样,本文列出判断CT误差曲线是否合格的3种判据,计算并校核了某蓄能水电厂实测的发电机保护CT误差曲线,验证曲线结果正确。本文的计算校核方法为蓄能水电厂保护CT误差曲线校验提供了验证方法,具有实践指导意义。The ratio error of current transformer must be within a certain range, to ensure the relay protection device have a correct reaction to the system conditions when a failure occurs in the system equipment and it produces maximum short circuit current. There are numbers of generation protection CT in the large pumped storage hydropower station. The specifications and the models of the CT are different. This article lists three criterions to judge whether CT error curve is qualified, calculates and checks those CT error curve measured in the large pumped storage power station, and proves the results are correct. The calculation method of this paper provides a verification method for the protection of the CT error curve of large pumped storage power station, and have a practical significance to those station.
分 类 号:TM77[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222