检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李侠[1,2]
机构地区:[1]西安财经学院管理学院,陕西西安710061 [2]长安大学环境科学与工程学院,陕西西安710054
出 处:《冰川冻土》2015年第4期1023-1027,共5页Journal of Glaciology and Geocryology
基 金:高等学校博士点科研基金项目(20090205120008)资助
摘 要:为了研究水热型融雪化冰路面结构中金属导热管合理布设间距,建立了基于传热学理论的路面融雪化冰有限元分析模型,对不同外界气温、不同埋设间距工况下金属热管融雪化冰能力进行计算分析.结果表明:外界气温在0^-10℃之间时,热管融雪效果明显.气温低于-10℃时,热管尽量埋设至路面中部;热管最优间距为100~200 mm,当热管间距>200 mm时,即使管内水温高达40℃,0℃等温线将不再连续.In order to study the reasonably pipe spacing in the road-surface able to melt snowwith running warm water,a finite element analysis model was established based on heat transfer theory. The ability of the metal pipes was analyzed and computed for different air temperatures and laying distances. The results showthat when air temperature is in between 0 ℃ and-10 ℃,the pipe system is able to melt snowefficiently; when air temperature is below-10 ℃ the pipe should be buried in the central section of the road-surface as far as possible.The optimal heat pipe spacing is 100 ~ 200 mm; when the spacing becomes more than 200 mm,the isotherm of0 ℃ will no longer be continuous,even if the pipe water temperature reaches 40 ℃ or more.
分 类 号:U417[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175