水资源论证后评估有关问题讨论  

Discussion on Interrelated Problems of Water Resources Post-assessment

在线阅读下载全文

作  者:王艳艳[1] 黄军[1] 祝东亮[1] 

机构地区:[1]安徽省水利水电勘测设计院,合肥230088

出  处:《中国农村水利水电》2015年第11期77-80,84,共5页China Rural Water and Hydropower

基  金:中央分成水资源费项目(201200801)

摘  要:建设项目水资源论证后评估旨在进一步检验建设项目实际的取、用、耗、排水情况和水资源节约、保护措施的有效性,以及水资源论证和取水许可制度在具体建设项目的落实情况。对后评估的技术路线、主要内容、评估的重点和需要注意的问题进行了探讨。结合案例分析,指出水资源论证后评估与建设项目水资源论证的区别和联系,可供建设项目水资源论证后评估报告书的编写与审查参考。Water resources post-assessment of construction projects is aimed at further evaluating the practical intake, using, consumption and drainage of water, effectiveness of water resources saving, protective measures of construction projects. The post-as-sessment also evaluates the implementation of water resources and the water intake permission system of specific construction projects. The paper studies technical route, main contents, key points and problems of post-assessment. Combined with examples, this paper points out the distinctions and relationships between posvassessment and assessment of water resources in construction projects, which could be provided as a reference in report writing and examination of water resources post-assessment of construction projects.

关 键 词:水资源论证 后评估 技术要点 案例分析 

分 类 号:TV213.9[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象