检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]深圳联泰兴电子科技有限公司,广东深圳518108
出 处:《科技创新导报》2015年第21期62-64,共3页Science and Technology Innovation Herald
摘 要:以太网供电(Po E)是利用以太网中传输高速网络信号的5类线来输送直流电,取消上网链接的终端要使用的电源,既可以节约成本,又可以对用电设备通过软件来控制,达到绿色环保的目的。但是,在原有的局域网(LAN)线上加入了直流电流后,多数网络设备制造商对其中网络变压器(LAN transformer)的选择认识不足,在满足直流电流加载功能的同时,损伤了电磁兼容(EMC)能力,故此,导致网络链接过程中的断续问题,这就是该文担忧之所在。The Power over Ethernet(Po E) is the use of Ethernet of the cat5 UTP cable to transfer direct current, do not need an adapter to supply the power to the end use, Po E technique can save cost, and can control the electric devices through network by software, achieve the goal of green environmental protection, but, while the dc current is joined on the original cable of the LAN network, many of the network equipment manufacturers have not understood the choice of the LAN transformer sufficiently, in order to meet the transferring of dc load current function at the same time, damage to the electromagnetic compatibility(EMC), therefore, lead to intermittent problem in the process of network link, this is the paper concerns.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.99