检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张明晶[1]
机构地区:[1]山西省水利水电勘测设计研究院,山西太原030024
出 处:《山西水利科技》2015年第4期123-125,共3页Shanxi Hydrotechnics
摘 要:汾河水库防洪与发电的客观工程条件良好,但是水电站工程机组在自动化运行过程中,频繁出现故障。文中通过对工程实际所存在问题进行分析,阐述了电站综合自动化系统的具体技改方案,工程技改可以改变原有系统机组老化、效率低下等缺点,为合理利用水能、提高水电效益和质量提供了重要保证。The objective engineering condition of flood control and power generation of the Fenhe Reservoir are good,but malfunction usually appears during the automation operation process of the hydropower units.Through analyzing the actual existing engineering problems,the article expounds the concrete technological transformation scheme of the integrated automation system of the power station. The engineering technological transformation can overcome the disadvantages such as unit aging,lower efficiency,etc.It also can provide important guarantee for the rational use of hydroenergy,increase the efficiency and quality of hydropower.
分 类 号:TP271[自动化与计算机技术—检测技术与自动化装置]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15