AHP-模糊综合评判法在铀矿机电系统安全评价中的应用  被引量:1

Application of AHP-fuzzy Comprehensive Evaluation Method in Uranium Mine Electromechanical System Safety Assessment

在线阅读下载全文

作  者:刘凯旋[1] 李向阳[1] 余修武[1] 蒋复量[1] 

机构地区:[1]南华大学环境保护与安全工程学院

出  处:《现代矿业》2015年第11期161-163,195,共4页Modern Mining

摘  要:根据某铀矿山的实际情况,将AHP-模糊综合评判法引入铀矿机电系统安全评价中。首先建立了多层次铀矿机电系统安全评价体系,运用层次分析法确定各指标权重,利用模糊数学对机电系统安全状况进行评价,结果显示机电设备的稳定性是影响铀矿机电系统安全性的首要因素。通过对评价结果的分析,验证了AHP-模糊综合评价在铀矿机电系统安全性评价中的可行性。According to the actual situation of a uranium mine,the AHP-fuzzy comprehensive evaluation method is adopted to conduct safety assessment of the electromechanical system in uranium mine.Firstly,a multi-level index system of the electromechanical system in uranium mine is established; then,the AHP method is adopted to determine the weight of each index; finally,the fuzzy mathematics is used to evaluate the safety situation of the electromechanical system in uranium mine. The result show that the stability of electromechanical equipment is the main factor that affecting the safety of electromechanical system in uranium mine. The feasibility of AHP-fuzzy comprehensive evaluation method in the safety assessment of uranium mine electromechanical system is proved.

关 键 词:铀矿 机电系统 层次分析法 安全评价 

分 类 号:TD868[矿业工程—金属矿开采] TD40[矿业工程—矿山开采] TD608

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象