检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南工业大学湖南省建筑节能与环境控制关键技术协同创新中心 [2]株洲市住房与城乡建设局 [3]湖南工业大学
出 处:《暖通空调》2015年第12期30-33,37,共5页Heating Ventilating & Air Conditioning
基 金:"十二五"国家科技支撑计划课题(编号:2011BAJ03B07)
摘 要:根据制冷机组能效等级降等允许的管道供回水最大温升与管道传热和电动机功率转化为热量之间的热平衡关系,推导出区域供冷基站直埋供冷管道最大长度计算公式。经实例计算表明,工程中直埋供冷管道应该采取保温措施,且保温层厚度取0.04m为宜,此种条件下,直埋供冷管道最大长度可以达到930~1400m。Based on the thermal balance among the allowed temperature increase of the supply water and return water when the energy efficiency of the chiller degrades, the heat transfer of the pipeline and the heat from the friction of electric motors, deduces the mathematical expression of the maximum length of the directly buried cooling pipeline in the district cooling base station. The results show that the insulation layer is needed for the directly buried pipeline in engineering applications with a thickness of 0.04 meter appropriately, which ensures a maximum pipeline length of 930 to 1 400 meters.
关 键 词:供冷基站 能效等级 直埋供冷管道最大长度 管道最大温升 保温层厚度
分 类 号:TU83[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.195.197