检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:齐全
出 处:《山西焦煤科技》2015年第10期47-49,共3页Shanxi Coking Coal Science & Technology
摘 要:以某矿分层开采为研究对象,结合数值模拟软件,分别建立上下层预留10 m煤柱模型,上层预留10 m煤柱、下层预留4 m煤柱模型和上下层都预留4 m煤柱模型3个数值计算模型,从煤柱的应力分布和破坏情况进行综合分析,研究表明:为保证煤柱应力集中程度较低,影响范围较小,受采动影响变化也较小,确定上、下煤层都留设4 m煤柱(无煤柱)方案为最优方案。A coal mine slice mining is as the research object,combines with the numerical simulation software,three numerical calculation models that upper layer and lower layer reserve 10 m pillar,upper layer reserves 10 m pillar and lower layer reserves 4 m pillar,upper layer and lower layer reserve 4 m pillar are set up respectively. The stress distribution and destruction of coal pillar are synthetically analyzed. The research shows that in order to ensure the lower pillar stress concentration degree,the limited scope of influence,and the smaller influence change by mining,determines that upper and lower coal seam reserving 4 m pillar is the optimal solution.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198