检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省水文水资源勘测局扬州分局,江苏扬州225002
出 处:《江苏水利》2015年第B12期67-68,共2页Jiangsu Water Resources
摘 要:生产建设项目水土流失主要发生在施工期,控制施工期水土流失的关键措施是临时防护措施。加强水土保持临时防护措施在泰州引江河第二期工程中的应用,是防治建设项目造成水土流失的重要途径。结合泰州引江河第二期工程水土流失原因及水土保持方案临时防护措施设计,对本工程施工现场临时防护措施存在的问题进行分析总结,进而提出完善临时防护措施的对策。Soil erosion and water loss of Construction projects mainly occurs in construction period.The key measures of controlling them are temporary protective measures 111. Strengthening the temporary protective measures of soil and water conservation in the second phase of Taizhou yinjiang canal, is an important approach to protect soil erosion and water loss during project construction. In this paper,combined with the reason of soil erosion and water loss and the design of the temporary protective meastzres,problems of temporary protection measures on the construction site are analyzed and summarized, and some countermeasures to improve the temporary protective measures are put forward.
关 键 词:泰州引江河第二期工程 水土保持方案落实 临时防护措施 对策
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.209.158