检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《工程抗震与加固改造》2015年第6期36-40,45,共6页Earthquake Resistant Engineering and Retrofitting
摘 要:试验设计制作了4个混凝土"士"字型节点缩尺模型构件,其中一个采用整体浇筑形式,对比柱采用植筋接长,加固柱I仅采用外包角钢加固,加固柱II在加固I的基础上在缀板上加螺栓。低周反复荷载试验表明:采用植筋接柱的框架节点承载能力低,破坏形态属于脆性破坏,抗震能力极差,加固柱I破坏形态由脆性破坏转换为延性破坏,但与整浇柱相比,未能达到预期的加固效果。加固柱II极限承载力比完整柱提高了11.7%,角钢在破坏时已屈服,耗能能力提高了40.7%,达到预期的加固效果。Four concrete scale models of the node are designed,the form of them like "士 ",one of them is made by the overall placement form,others are taken for long by planting bar,reinforced column I is only reinforced by outsourcing angle steel,reinforcement column II is reinforced by the form like reinforced column I and screwed nut in the decorated. Low cyclic loading tests show that: the frame column node of the planting bar has low arrying capacity; failure mode is brittle fracture,poor seismic capacity,reinforced column I becomes ductile brittle failure because of the angle steel bar,but compared with the overall placement form,it fails to achieve the desired reinforcement effect; ultimate bearing capacity of reinforced column II increases 11. 7% than a full column,the angle steel has yielded when it damaged,energy dissipation capacity increases 40. 7%,and the desired reinforcement effect is achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.136.236.39