检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许定胜
机构地区:[1]第二炼铁厂
出 处:《南钢科技与管理》2015年第4期39-42,共4页NISCO Technology and Management
摘 要:新建的2×1800^3高炉开炉分为三个阶段,第一阶段开炉准备,包括各种原燃料及培训学习准备、做好各种预案;第二阶段做好高炉开炉料的理论配料计算及加料要求;第三阶段点火开炉,包括点火初始风口配置及第一炉出铁要求等。通过精心准备,两座高炉均实现快速开炉达产。Blowing-in of New-built 2 ×1800m^3 BF was divided into three stages: The first is preparing blow-in, including preparing materials and fuels and training, making the preparedness plans. The second is calculation of burden and charging. The third is blow-in , including collocation of the tuyeres at the beginning of and tapping of the first heat. Af- ter good preparation, two blast furnaces have reached its design capacity at its commissioning.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.192