上海石洞口第一电厂改建工程温排水物理模型试验研究  被引量:3

Experimental investigation on thermal discharge of reconstruction project of the Shanghai Shidongkou First Power Plant by physical model

在线阅读下载全文

作  者:鞠奔 徐世凯[1] 王勇[1] 阮仕平[1] 

机构地区:[1]南京水利科学研究院,江苏南京210024

出  处:《电力科技与环保》2015年第6期8-11,共4页Electric Power Technology and Environmental Protection

摘  要:基于温排水物理模型相似条件,建立了由潮控系统、可调节加热温控系统和温度多点采集系统等组成的温排水物理模型。分别在各种潮型下进行了试验,对改建后的电厂机组温排水的温升分布及取水温升状况进行了分析。对改建后利用现有取排水设施的合理性进行了论证,为工程建设和相关环评工作提供了科学依据。Based on the similar laws of physical model of cooling water,it established a cooling water physical model that consists of tide control system,adjustable heating temperature control system and multi-point temperature acquisition system. A series of experiments have been done under various tide type after reconstruction of the power plant then the temperature rising distribution of the discharge water and the temperature rising situation of inlet water have also been analyzed. The rationality of using the existing intake and drainage facilities after reconstruction has been demonstrated,this would provide a scientific basis for the construction project and related Environmental Impact Assessment work.

关 键 词:温排水 物理模型 潮流模拟 取、排水口 

分 类 号:X57[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象