检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:甄宏宁 梁志瑞[2] 王莹 王震泉[1] 张诗滔[1]
机构地区:[1]江苏省电力设计院,江苏南京211102 [2]华北电力大学,河北保定071000
出 处:《江苏电机工程》2015年第6期18-22,共5页Jiangsu Electrical Engineering
摘 要:为了解决近期及未来南京主城区220 k V西环网存在输电通道瓶颈的问题,电力规划部门决定采取在电网中串接统一潮流控制器(UPFC)的措施。文中结合当地电网实际情况提出了UPFC容量选择的方法和思路。借助电力系统综合分析程序(PSASP),通过潮流稳态计算,进行了UPFC容量对提升南京西环网供电能力的敏感性分析,并且提出了UPFC最优容量选择。In order to solve the transmission channel bottleneck problem will occur in Nanjing 220 k V western grid, a series unified power flow controller(UPFC) is planned to install into the grid. Considering the actual situation of the power grid, a method for selecting the UPFC capacity is proposed. In this method, sensitivity analysis of UPFC capacity to promote Nanjing western network supply ability is given through power flow calculation in PSASP. Finally, the suitable UPFC capacity for Nanjing 220 k V western power grid is presented.
分 类 号:TM744[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30