检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国南方电网调峰调频发电公司清远蓄能发电有限公司,广东清远511853 [2]广东水利电力规划勘测设计研究院,广东广州510635
出 处:《水利水电技术》2015年第3期110-114,共5页Water Resources and Hydropower Engineering
摘 要:运用Fluent软件建立三维模型,对某调水工程中的一段有压管道充水过程的水力特性进行三维数值模拟计算,采用PISO算法分析了管道充水过程中气体压力、水力要素及两相流流态变化情况。结果表明:充水流量的大小会导致管内气体压力的强烈变化;气体压力变化又会影响进口流速。在水体流到管道后部管壁之前,流线均匀,流态较好;之后气液两相彼此相间,流线错综复杂,流态紊乱,湍流能量较强。建议以"小流量充水原则"对类似输水管道进行试充水操作。A 3- D numerical simulation on the hydraulic characteristics of the water filling process for a section of the pressure pipeline of a water conveyance project is made with a 3- D model established with the software of Fluent,in which the variations of the air pressure,hydraulic factors and the two-phase flow regime during the water filling process of the pipeline are analyzed with PISO algorithm. The result shows that the magnitude of flow rate is to cause a strong change of the air pressure inside of the pipeline,while the change of the air pressure is to influence the inlet flow velocity. Before the water reaches the wall of the rear part of the pipeline,the streamline is uniform with a better flow regime,and after that,both the air and the liquid phases are interlocked each other with a complicated streamline and stronger turbulence energy. Therefore,it is suggested that it is better to make trial water filling for the similar water conveyance pipeline with the principle of filling with smaller flow rate.
分 类 号:TV134[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117