检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘晓平[1] 扈世龙[1] 任启明[1] 赵江[1]
机构地区:[1]长沙理工大学,湖南长沙410114
出 处:《水利水电技术》2015年第3期136-140,共5页Water Resources and Hydropower Engineering
基 金:湖南省交通科技项目(201027);国家自然科学基金资助项目(51309037)
摘 要:采用物理模型试验和数学模型计算相结合的方法,研究了上游堰高对折线型实用堰堰面泥沙淤积的影响。结果表明:上游堰高为3 m时,由于上游堰高值较大,且堰顶高程未高于上游河床高程,堰面检修门槽处的底流速和紊动能较大,泥沙不易淤积停留,对检修闸门正常启闭的影响较小。试验结果对类似工程设计具有一定的参考价值。With the method combined with both the physical model test and mathematical model calculation,the impact from the upstream weir height on the sedimentation on the weir face of the broken line practical weir is studied herein. The result shows that when the upstream weir height is 3m,the velocity of the bottom flow and the turbulent energy at the slot of the maintenance gate are larger and the sediment is not prone to remain therein due to the larger upstream weir height and the elevation of weir crest that is not higher than the upstream river bed,which has only less impact on the normal opening and closing of the maintenance gate. The test result can provide a certain reference for the similar engineering design.
分 类 号:TV132.22[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.227