检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国人民武装警察部队水电第一总队,广西南宁530028
出 处:《水利水电技术》2015年第7期28-31,共4页Water Resources and Hydropower Engineering
摘 要:通过对苗尾水电站大坝基础河床段水平廊道内帷幕灌浆两个试验区施工过程及成果进行分析和总结,探讨倾倒变形发育地质条件下帷幕灌浆涌水孔段及回浆变浓孔段特殊情况处理工艺的有效性和可行性,为相似地质条件下帷幕灌浆特殊情况处理工艺提供参考和借鉴。Through the analysis and summarization made on the construction processes of two experimental zones for curtain grouting in the horizontal gallery of the river-bed section of the dam foundation for Miaowei Hydropower Station,the effectiveness and feasibility of the technology for treating the special conditions of the hole-section with water-gushing and the hole-section with densification of recycled slurry of the curtain grouting under the geological condition of the development of toppling deformation are discussed herein,so as to provide some references for the treatment technology for the special conditions of curtain grouting under the similar geological condition.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28