富水顶板大采高综采工作面涌水与矿压关系研究  被引量:4

Study on the Relationship between Water Inflow and Mine Pressure in Fully-mechanized Mining Working Face with Rich Water Roof

在线阅读下载全文

作  者:庞立宁[1,2] 毛德兵[1,2] 李春睿[1,2] 

机构地区:[1]天地科技股份有限公司开采设计事业部,北京100013 [2]煤炭科学研究总院北京开采研究院,北京100013

出  处:《煤矿开采》2015年第6期90-93,100,共5页Coal Mining Technology

基  金:国家自然科学面上基金资助项目(51474128);国家自然科学青年基金资助项目(51304115);国家十二五科技支撑计划(2012BAB13B02)

摘  要:针对纳林河二号煤矿31101富水顶板大采高综采工作面涌水情况,分析了工作面涌水与工作面矿压以及顶板岩层结构之间的关系。通过理论计算得出了关键层层位,认为基本顶及其控制的上覆岩层和关键层Ⅱ及其控制的上覆岩层共同组成了"复合悬臂梁—复合铰接岩梁"结构。计算得出关键层Ⅱ的初次断裂步距为210.3m,周期性断裂步距为101.1m,与现场实际矿压与涌水情况相符。认为"复合悬臂梁"的周期性破断失稳使得工作面产生"小"出水,而后发生小周期来压;"复合铰接岩梁"的周期性破断失稳使得工作面产生"大"出水,而后发生大周期来压。研究结果为31101工作面的出水预测提供了理论依据,并为相似工作面涌水与矿压关系研究提供参考。This paper aims at the problems of water inflow in the 31101 fully-mechanized mining working face of very thick coal seam with rich water roof in Nalinhe Ⅱ Coal Mine,the relationship among the water inflow,mine pressure and roof strata structure is analyzed. By theoretical calculations, the key strata are distinguished, structure of "composite cantilever-composite articulated rock beam" composed by main roof with the strata controlled and the No. 2 sub-key stratum with the strata controlled. The initial caving step distance is calculated 210. 3m,cyclical caving step distance is 101. 1m,and it consistents with the actual situation. Pointing out that cyclical rupture instability of composite cantilever rock beam causing small water with weak cycle pressure and that cyclical rupture instability of composite articulated rock beam causing heavy water with powerful cycle pressure; Providing the theoretical basis of water forecasting in 31101 working face,the study of the relationship between water and rock pressure of mining face is similar to provide there ference.

关 键 词:关键层 复合悬臂梁 复合铰接岩梁 垮落步距 破断失稳 

分 类 号:TD324[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象