催化分馏塔淹塔原因分析及预防措施  被引量:1

Cause analysis of catalytic fractionation tower flooding and preventive measures

在线阅读下载全文

作  者:包忠臣[1] 

机构地区:[1]大庆石化公司炼油厂,黑龙江大庆163711

出  处:《炼油与化工》2015年第6期24-26,共3页Refining And Chemical Industry

摘  要:某炼油厂二重催分馏塔在累计运行1 085 d后突然出现淹塔情况,采取甩掉塔顶换热塔盘、建立新的顶部内回流等措施,保证生产平稳运行至装置检修。通过检修对塔内部构件的检查及塔内附着物进行化验,对淹塔原因进行了分析,并提出了预防措施,确保装置长周期运行。After accumulative operation of 1085 days,tower flooding occurred in the fractionation tower of the second heavyoil catalytic unit of an oil refinery. Measures such as getting rid of tower top heat exchange tray and building new top internalreflux were taken to ensure stable production operation until the unit's overhaul. During overhaul,inspection was made tothe tower internals,chemical test was made to the attachments inside the tower,analysis was made to the cause of towerflooding,and preventive measures were proposed to ensure long-period operation of the unit.

关 键 词:催化裂化装置 分馏塔 淹塔 汽油 

分 类 号:TE962[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象