检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065
出 处:《西北水电》2015年第6期6-9,共4页Northwest Hydropower
摘 要:镇安抽水蓄能电站采用水库淤积一维数学模型,考虑抽放水状况的水库泥沙淤积过程,计算不同运行年限抽放水过程的过机含沙量以及颗粒组成,计算成果表明过机含沙量无法满足抽水蓄能电站的要求。因此,采用设置工程防排沙措施——下水库拦沙坝,实现抽水蓄能电站对调节库容、过机含沙量的要求,较好地解决镇安抽水蓄能电站的泥沙问题。By application of on one-dimensional mathematical model for the reservoir sedimentation and in consideration of the sedimentation accumulating course during water pumped and discharged for Zhen'an Pumped Storage Power Plant, sediment concentration and particle com- position through the unit during water pumped and discharged in different service life are analyzed and calculated. The study results present that the sediment concentration through the unit cannot meet the requirements of the pumped storage power plant. Therefore, the engineering measure, namely, construction of sand-preventing dam in the lower reservoir, is applied to meet the requirements of the plant on the active reservoir capacity and sediment concentration through the unit. Application of this measure solves the sediment problem of Zhen'an Pumped Storage Power Plant well.
关 键 词:抽水蓄能电站 泥沙淤积 计算 过机含沙量 拦沙坝
分 类 号:TV145[水利工程—水力学及河流动力学] TV737
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112