山口水电站导流洞设计糙率选择与过流能力分析  被引量:2

Roughness Selection and Flowing Capacity Analysis of Design of Diversion Tunnel,Shankou Hydropower Project

在线阅读下载全文

作  者:李江 王健[2] 

机构地区:[1]新疆水利水电规划设计管理局,乌鲁木齐市830000 [2]新疆水利水电勘测设计研究院,乌鲁木齐市830000

出  处:《西北水电》2015年第6期35-39,共5页Northwest Hydropower

摘  要:山口水电站施工导流采用河床一次断流、混凝土围堰挡水度汛、左岸导流洞过流的导流方式,后期封堵。结合围岩类别,为降低工程造价,设计采用了以边墙喷锚支护、底板现浇混凝土衬砌的结构型式,由于洞室断面较大,隧洞糙率系数的选择成为制约隧洞设计的关键因素。经工程类比与分析,综合采取的糙率系数0.024经过施工考验,过流能力基本满足设计要求,取得了较好的效果。The construction diversion of Shankou Hydropower Project applies one-time river closure, concrete cofferdam retaining water in flood period and flow diversion through right bank diversion tunnel to be plugged at later stage. The side wall supported with shotcrete and anchor bar and the base slab concrete cast in situ are applied to reduce the project cost. As the cavern section is larger, selection of the roughness coefficient of the diversion tunnel become the key factor of the design of the tunnel Through the engineering analogy and analysis, the roughness eoetticient of 0.024 is applied in consideration of factors. Experienced by construction, the flowing capacity basically satisfies design requirement.

关 键 词:施工导流 隧洞不衬砌 喷锚支护 糙率系数 

分 类 号:TV551.12[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象