检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]成都军区空军勘察设计院,成都市610041 [2]中国民航大学,天津市300300
出 处:《勘察科学技术》2015年第6期27-32,共6页Site Investigation Science and Technology
摘 要:该文结合西南某大面积山区填方工程,通过对其边坡损毁、孔洞展布和排水系统损坏特征等方面的调查、试验和系统分析,得出了上述高填方体出现变形和破坏的主要原因是地下水渗透破坏、高地下水压力、地表水入渗潜蚀、冻融和降水冲刷共同作用结果,并提出了局部换填、孔洞和塌陷及时封堵等应急处治措施和截排水沟、填方体顶面覆盖粘性土层、换填或打仰斜排水孔引排地下水等永久性处理措施,取得了较好的效果。Combined with a large mountainous fill project in southwest China, through ting and systematically analyzing on the slope damage, hole distribution and the damag investigating, tese characteristics of drainage system, this paper obtains the main reasons causing the high hill deformation and destruction are the combined action of groundwater seepage failure, high-groundwater pressure, potential erosion of surface water infiltration, frost boil and rainfall scouring. This paper also proposes the emergency treatment meas- ures of local replacement, plugging holes and collapse timely, meanwhile, this paper proposes permanent measures such as intercepting drain, filling the cohesive soil covering the top surface of the body, and replacement or drilling inclined drainage holes to discharge the groundwater, which achieve better results.
分 类 号:TU751.4[建筑科学—建筑技术科学] TU43
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175