检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河上游水电开发有限责任公司,青海西宁810008
出 处:《大坝与安全》2015年第5期20-22,共3页Dam & Safety
摘 要:结合李家峡拱坝左岸坝肩锚索加固的现状,采用大坝原型加密观测试验成果,并运用间接评价方法和有限元仿真模拟计算,对坝肩预锚超载加固效果进行评价。分析认为,左岸坝肩超载加固后,左重力墩表部群锚加固区的径、切向拉应力值减小或拉应力转变为压应力或压应力变大,应力分布有均匀化趋势。结论是超载加固提高了左岸坝肩的整体稳定性。Combined with current situation of reinforcement by anchor cable at the left abutment of Liji- axia arch dam, prototype observation test results and simulation by FEM were used to evaluate the rein- forcement effect. By analysis, the conclusion was gotten that after the reinforcement, the original tensile stress in the reinforcement area reduced or turned into compressive stress, or the compressive stress in- creased and the stress distribution was becoming homogenized. As a result, the reinforcement enhanced the stability of the left abutment.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7