出 处:《水力发电》2016年第1期45-48,共4页Water Power
摘 要:依托施工期的某水电站,采取现场地质调查结合声波测试、变形试验及大剪试验等技术手段,在准确分析建基岩体工程地质条件的基础上,对建基岩体进行评价,据此对勘察阶段选定的建基面(河床坝段)进行高程的优化,并利用二维数值分析软件Phase,对优选的建基面进行变形稳定性校核。分析结果表明,天然及地震工况下,强度折减系数均大于3,优选的建基面满足混凝土重力坝变形稳定性要求。By field geological survey combining with sound wave test, deformation test and large shear test to accurately analyze the engineering geological conditions of rock mass, the rock mass under foundation surface in a hydropower station during construction period is evaluated, and then the elevation of foundation surface (riverbed dam section) determined in investigation stage is optimized. The deformation stability of optimized foundation surface is checked by 2D numerical analysis software Phase. The results show that the strength reduction factors are bigger than 3 under natural and earthquake conditions and the optimized foundation surface meets the requirement of concrete gravity dam deformation stability.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7