作 者:钟应伟[1,2]
机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]国家金属采矿工程技术研究中心,湖南长沙410012
出 处:《矿业研究与开发》2015年第12期43-46,共4页Mining Research and Development
摘 要:为解决某矿在下部采场回采影响下上盘斜井安全稳定性问题,应用3Dmine-FLAC3D软件平台,对该矿在不同深度采场分步回采环境下上盘斜井的塑性区、应力应变变化规律及变形机理进行了研究。结果表明:上盘斜井无塑性区贯通,应力变化趋势较平稳,局部顶板会出现应变速率增大现象。针对该矿上盘斜井失稳规律,拟定相关的综合处理技术措施。该矿山实施留设临时保安矿柱+废石充填+局部喷锚网支护的方案后,斜井地压控制作用明显。For solving the safety stability problem of the inclined shaft in hanging wall when stoping the lower part in one mine,the changing law and its mechanisms of plastic zone,stress and strain in hanging wall were analyzed under slice mining the lower orebody by 3Dmine-FLAC3 D.Results showed that the plastic zone of the inclined shaft in hanging wall was not connected with the surface or the lower stopes.The stress was increasing stably,and the strain rate partly increased in the roof.According to the instability laws of the inclined shaft in hanging wall,related technical measures were established.Through implementing the schemes of setting temporary safety pillar,filling with waste stone,and spraying anchor network,the ground pressure of the inclined shaft was well controlled.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15