基于FCE的桥梁运营阶段风险分析  被引量:1

Risk estimation in bridge operation stage based on fuzzy comprehensive evaluation

在线阅读下载全文

作  者:梁晓飞[1] 李忠梅[1] 郑小燕[2] 

机构地区:[1]山东理工大学建筑工程学院,山东淄博255049 [2]合肥工业大学交通运输工程学院,安徽合肥230009

出  处:《山东理工大学学报(自然科学版)》2015年第4期1-5,共5页Journal of Shandong University of Technology:Natural Science Edition

基  金:山东省自然科学基金资助项目(ZR2011EL010);中央高校基本科研业务费专项资金资助项目(2013G1502017)

摘  要:为了对桥梁事故进行源头管理,提高桥梁运营阶段的安全性,从风险发生机理出发,建立了风险评估模型、风险接受准则和风险等级评价标准.考虑到风险损失的不确定性和模糊性,将模糊数学方法与层次分析法相结合构建了基于模糊综合评判(FCE)的失效后果评价方法,使风险损失量化,从而客观地对桥梁运营期风险进行评价.实例证明该方法具有可行性和有效性.In order to control bridge accident at the source and improve the safety performance at the bridge operation stage,risk assessment mode,risk acceptance criteria and risk level evaluation criteria were established from the mechanism of risk.Then,taking into account the risk loss of uncertainty and ambiguity,fuzzy comprehensive evaluation method of the consequences of failure was created based on the fuzzy mathematics method and analytic hierarchy process to quantify the risk of loss and complete risk evaluation.Example shows that the method is feasible and effective.

关 键 词:风险估计 层次分析法 风险损失 隶属度函数 

分 类 号:U445.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象