蒋家河煤矿综放工作面巷道变形机理分析  被引量:2

Fully Mechanized Working Face Roadway Deformation Mechanism and Influence Factors Analysis of Jiangjiahe Coal Mine

在线阅读下载全文

作  者:刘会彬[1,2] 何万盈 姜波[1] 

机构地区:[1]中国矿业大学,江苏徐州221116 [2]彬县煤炭有限责任公司,陕西咸阳712000

出  处:《煤炭技术》2016年第1期54-57,共4页Coal Technology

摘  要:通过对彬长矿区蒋家河煤矿综放工作面掘进和回采期间巷道变形特征分析,总结了巷道变形机理,认为主要诱导因素为底板淋水软化后的塑性变形应力重新分布,造成巷帮和顶底板的变形加剧。蒋家河矿采取的联合补强支护和起底、扩帮、挑顶等一系列综合治理措施有效治理了软底巷道变形,具有一定的借鉴意义。By analysis of Binehang mining area jiangjiahe coal mine working face roadway detormation characteristics during excavation and mining, summed Up the roadway deformation mechanism, think the main indueing factors are the bottom pouring water softening plastic deformation leading to stress re-distribution, resulting in roadway sides and roof and floor deformation seriously. Jiangjiahe coal mine take joint reinforce branch support and repair, expansion wall, the top pick etc. which are a series of comprehensive management measures effective governance of the soft bouom roadway deformation, have certain reference significance.

关 键 词:综放巷道 变形机理 顶板下沉 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象