检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东科技大学矿业与安全工程学院,山东青岛266590 [2]山东科技大学土木工程与建筑学院,山东青岛266590
出 处:《煤炭技术》2016年第1期62-65,共4页Coal Technology
基 金:国家自然科学基金项目(51379116);山东省自然科学基金项目(ZR2013EEZ001)
摘 要:针对沿空留巷施工过程中出现的围岩变形量过大等问题,通过对沿空留巷围岩变形的影响因素进行分析,认为留巷宽度过大是引起围岩变形的主要原因。基于此,提出了减小留巷宽度的优化方案并进行了现场工业性试验。试验结果表明,在围岩变形进入稳定阶段后,顶底板移近量降低了58%,两帮移近量降低了60%,有效地控制了巷道围岩变形。According to the problems of large surrounding rock deformation at the gob-side entry, through analysis of influencing factors of surrounding rock deformation of gob-side entry, the large deformation of surrounding rocks of gob-side entry relates primarily to the width of gob-side entry. Therefore, to control its deformation, the program of reducing the width of gob-side entry is optimized. The results show that the roof to floor convergence dropped by 58% and two sides convergence dropped by 60% after surrounding rock deformation into a stable phase, the deformation of surrounding rock is effectively controlled.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166