KR铁水脱硫顶吹扒渣工艺试验研究  被引量:1

Experimental study on the top blowing slag skimming process of KR hot metal desulphurization

在线阅读下载全文

作  者:丁金发[1] 李胜超[1] 

机构地区:[1]武汉钢铁(集团)公司炼钢总厂,湖北武汉430083

出  处:《钢铁研究》2015年第6期48-51,共4页Research on Iron and Steel

摘  要:为了提高脱硫扒渣效率及消除底吹扒渣存在的漏铁风险,武钢炼钢总厂二分厂开发了KR顶吹扒渣设备,并用于铁水脱硫。起初生产中存在喷枪寿命低及喷吹效果差的问题,有针对性地对喷枪顶吹系统进行了改造,并对喷吹工艺进行了优化,喷枪寿命由最初30次提高到了62次,扒渣时间缩短了2min。In order to improve desulphurization and slag skimming efficiency and rule out hot metal leaking risk with bottom blowing slag skimming,No.2Steelmaking Plant of WISCO developed KR top blowing slag skimming equipment for desulphurization of hot metal.At first,the spray gun life was low and the slag skimming effect was poor.After the system of the top lance was improved and the spray blowing process was optimized,the spray gun life was increased to 62 times from the initial 30 times and slag skimming time was shortened by 2minutes.

关 键 词:KR铁水脱硫 顶吹扒渣 喷枪 

分 类 号:TF71[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象