大红山铁矿工程地质灾害综合防治措施研究  被引量:11

Study on Comprehensive Control Measures of Geological Disaster in Dahongshan Iron Mine

在线阅读下载全文

作  者:徐士申 

机构地区:[1]玉溪大红山矿业有限公司,云南玉溪市653100

出  处:《矿业研究与开发》2016年第1期99-105,共7页Mining Research and Development

基  金:国家科技支撑计划项目(2013BAB02B06)

摘  要:大红山铁矿是一座特大型的露天地下联合开采矿山。针对崩落法开采厚大缓倾斜深部矿体导致的上覆岩层与地表地质灾害,提出并实施了一整套相应的综合防治措施,包括上覆岩层微震监测系统、沉降变形实时自动监测报警系统,地表变形监测系统,以及主采区顶板硐室爆破强制落顶、地表塌陷范围警戒和塌陷坑回填治理措施等。通过综合防治,有效避免和消除了上覆岩层的工程与地表地质灾害,取得了安全生产的良好效果。Dahongshan Iron Mine is an oversize open underground combined mine. The caving mining was used to stope the large and slightly-inclined orebody, which caused geological disasters in overburden and surface. Aimed at these problems, a full set of comprehensive control measures was proposed and implemented, including the microseismic monitoring system, the real-time automatic monitoring and alarming system for subsidence in overburden, the surface deformation monitoring system, the chamber blasting for forced caving roof in main panel, the warning area of surface subsidence, and the backfill for collapse area. Through comprehensive control, the geological disasters in overburden and surface were effectively avoided and removed, which ob- tained good effects on safe production.

关 键 词:崩落采矿法 地质灾害 微震监测 硐室爆破 塌陷坑回填 

分 类 号:P694[天文地球—地质学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象