检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州省大坝安全监测中心,贵州贵阳550002
出 处:《水利水电技术》2015年第12期90-95,共6页Water Resources and Hydropower Engineering
摘 要:本文介绍了贵州省沙坝水电站碾压混凝土双曲拱坝的变形监测布置情况,对工程下闸蓄水运行以来水平位移监测资料进行整理及多元线性回归分析,初步理清拱坝的整体变形规律和运行性态,为今后沙坝水电站大坝的安全运行管理提供参考。The arrangement of the deformation monitoring of the RCC double-curvature arch dam for Shaba Hydropower Station in Guizhou Province is described herein, and then the horizontal displacement monitoring data since the impoundment of it are processed, while the multiple linear regression analysis is made on them as well ; from which the overall deformation law and the operation behavior of the arch dam are preliminarily obtained, thus provides a reference for the safety operation management for the dam in the days to come.
关 键 词:碾压混凝土拱坝 位移监测 变形性态分析 外掺氧化镁混凝土
分 类 号:TV642.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38