作 者:杨玉银[1] 陈长贵[1] 黄浩[1] 刘志辉[1] 张永强[1] 张健鹏[1] 廖志华[1]
机构地区:[1]中国水利水电第五工程局有限公司,成都610066
出 处:《工程爆破》2015年第6期67-72,共6页Engineering Blasting
摘 要:为了解决乌干达卡鲁玛尾水隧洞10#施工支洞钻孔利用率低、进度滞后、光爆效果差等问题,组织爆破工程技术人员深入施工现场,对现有爆破方案进行优化,提出了"分部楔形掏槽"的概念。并与水平V形掌子面相结合,成功的将硬岩开挖爆破钻孔利用率从79.4%提高到98.5%以上;将平均单循环进尺从2.62m提高到3.25m,有效加快了开挖进度、降低了炸药、雷管单耗;通过调整光爆参数、装药结构,将光面爆破半孔率提高到90%以上。In order to solve the issues of low utilization of borehole,lagging progress and poor effected smooth blasting during the Adit-10 tunnel construction in Uganda Karuma HPP TRT Project and the engineers and technicians were organized to the site to optimize the existing blasting scheme.The concept of ' Sectional Wedge Cutting' was finally proposed,which combined with horizontal V-shaped working face.Many improvements were achieved by the application of this new scheme,including that blasting and drilling utilization of hard rock excavation increased from 79.4%to 98.5%and the average single cycle footage increased from 2.62 mto 3.25 m.The progress of excavation was effectively speeded up,the consumption of explosive and detonator was reduced,and the half-borehole ratio of smooth blasting was increased to more than 90% by adjusting the smooth blasting parameters and charge structures.
关 键 词:硬质岩石 隧洞开挖 分部楔形掏槽 钻孔利用率 单循环进尺 炸药单耗 光面爆破
分 类 号:TD854.2[矿业工程—金属矿开采] U45[矿业工程—矿山开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.5.121