电动潜油柱塞泵举升工艺超负荷停井原因  

Analysis on well-shutting-down caused by overloading of electric submersible plunger pump

在线阅读下载全文

作  者:王竺[1] 王瑛[1] 曹鼎洪[1] 刘洪军[1] 侯志欣[1] 

机构地区:[1]大庆油田有限责任公司第七采油厂

出  处:《石油石化节能》2016年第1期1-2,共2页Energy Conservation in Petroleum & PetroChemical Industry

摘  要:电动潜油柱塞泵举升工艺作为机采井的一种新型节能举升工艺,经过10多年的研究与试验,使工艺结构日趋成熟,但部分试验井频繁出现超负荷停井问题。结合葡萄花油田现场试验数据,采用统计分析方法,得出电动潜油柱塞泵的直线电动机设计安全系数,即当实际泵深与直线电动机理论扬程之比小于或等于40%时,可以满足工艺运行需求,保证油井运行时率,为电动潜油柱塞泵举升工艺的进一步推广提供借鉴。As a new type of energy-saving lift technology, the electric submersible plunger pump has been well improved after ten years research. Because of no clear understanding for selecting well conditions and design methods in the primal test period, the linear motor of electric submersible plunger pump was designed smaller and the operating currents were higher. Some wells are overloaded and frequently shut down. According to Putaohua oilfield test data and using the statistical analysis method, the safety factor of the linear motor is concluded in this paper. When the ratio of actual pump depth and the theory delivery head of linear motor is less than or equal to 40%,the safety factor can meet demands of process and ensure oil wells failure-free operation.

关 键 词:电动潜油柱塞泵 举升工艺 超负荷 停井 

分 类 号:TE933.3[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象