检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卫晋鹏
机构地区:[1]晋城金成矿山建筑工程有限责任公司,山西晋城048000
出 处:《煤矿现代化》2016年第1期53-55,共3页Coal Mine Modernization
摘 要:以寺河二号井15301工作面为试验对象,在153011巷掘进期间,采用113mm交叉钻孔布孔方式,分别采用4m、6m、8m、10m 4种钻孔间距进行15号煤本煤层瓦斯抽放试验。结果表明:钻孔间距对于极限抽放量和最大预抽率影响较大,钻孔间距由10m减小到4m,瓦斯极限抽放量增加15%,最大预抽率由20%增大到25%,达到最大预抽率所需抽放时间由240d减少到180d;钻孔间距由6m较小到4m,瓦斯极限抽放量变化很小,确定钻孔间距为6m;抽放时间超过180d,抽放速率明显下降。Set 15301 workface of Sihe Second Coal Mine as test object, doing 15# coal seam gas drainage experiment with 4 meters,6 me- ters ,8 meters, 10 meters these four kinds of hole space and 113 millimeters cross hole during 153011 roadway's driving. Results show: The hole space has a great influence on the maximum drainage volume and maximum pre pumping rate, the hole space is reduced from 10m to 4m, the gas drainage volume increases by 15%, the maximum pumping rate increases from 20% to 25%, and the maximum pre pumping rate is reduced from 240 days to 180 days ; the hole space is reduced from 6 meters to 4 meters, and the maximum drainage volume's change is very small, so set hole space as 6 meters, drainage for more than 180 days, drainage rate decreased significantly.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.17.22