深厚冲积层冻结法凿井冻掘配合问题探讨  被引量:2

Discussion on the Cooperation of Freezing and Excavation in Shaft Sinking by Freeze Method in Deep Alluvium

在线阅读下载全文

作  者:魏国强 陈镭 

机构地区:[1]河南煤炭建设集团有限公司,河南郑州450009 [2]北京煤科联应用技术研究所,北京100013

出  处:《建井技术》2015年第6期44-47,4,共5页Mine Construction Technology

摘  要:深厚冲积层冻结法凿井施工中,冻掘矛盾一直比较突出。结合我国已竣工的穿过冲积层厚度675.6m的龙固北风井冻结法凿井实践经验,分析深厚冲积层井筒冻结方案和掘砌施工相关问题,介绍了深厚冲积层冻掘相互配合的工程经验,并提出相应建议,可为井筒冻结设计和掘砌施工提供借鉴。The contradiction between freezing and excavation is always more prominent in shaft sinking by freeze method in deep alluvium.Combined with the construction experience of completed shaft,Longgu North Ventilation Shaft which constructed by freeze sinking method in 675.6-meter-deep alluvium in Shandong Province,East China,some relevant problems between freezing plan and construction of excavation and lining were analyzed,and engineering experience of freezing and excavation cooperation was introduced,simultaneously some recommendations were put forward.The paper can provide references for the freezing design and construction of excavation and lining of shaft in deep alluvium.

关 键 词:深厚冲积层 冻结法凿井 井帮温度 冻掘配合 

分 类 号:TD265.34[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象