50MW CCPP中余热锅炉和汽轮机技术的研究  被引量:1

HRSG and Steam Turbine Research of 50MW CCPP

在线阅读下载全文

作  者:徐迎超[1] 樊泳[1] 阎波[2] 范晓明[2] 寇彦德[1] 

机构地区:[1]北京首钢国际工程技术有限公司,北京100043 [2]首钢股份公司迁安钢铁公司,迁安064404

出  处:《工程与技术》2015年第2期44-47,共4页

摘  要:首钢迁钢2X50MW燃气-蒸汽联合循环(CCPP)发电工程结合国内机组运行情况,对燃气-蒸汽联合循环发电机组系统做了以下改进:余热锅炉采用三压锅炉,余热锅炉主蒸汽参数采用次高压高温蒸汽;蒸汽轮机采用全周进汽快速启动高温次高压汽轮机。新技术的应用,余热锅炉热效率提高5%,联合循环发电机组综合效率提高9.6%,年增加发电效益2864万元。2X50 MW fuel gas-steam combined cycle power project of Shougang Qiangang steel plant in combination with internal operation cites, the following improvements on the system of CCPP:HRSG adopted three pressure boiler, the parameter of main steam is sub-high pressure and high temperature; steam turbine using uniform-admission steam quick start times of high temperature sub-high pressure steam turbine. The application of the new technology, the heat efficiency of HRSG increased 5%, the comprehensive efficiency of combined cycle power increased 9.6%, the power benefit increased 28 640 000 yuan/year

关 键 词:煤气 CCPP 燃气轮机 余热锅炉 蒸汽轮机 

分 类 号:TM611.31[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象