基于间歇时间和流水步距的流水施工优化模型  被引量:6

Flow Construction Optimization Model Based on Interval Time and Flow Pace

在线阅读下载全文

作  者:李会静[1] 

机构地区:[1]重庆电子工程职业学院建筑与材料学院,重庆401331

出  处:《科技通报》2016年第2期119-122,共4页Bulletin of Science and Technology

摘  要:针对现有的流水施工排序模型还存在效率不高的问题,本文提出了一种基于间歇时间和流水步距的流水施工优化模型,该模型首先针对分段不分层和分段分层两种情况对流水施工的间歇时间进行优化,然后构建基于流水步距的流水施工优化模型,对流水工期进行了尽可能的缩减。仿真试验结果表明,本文提出的基于间歇时间和流水步距的流水施工优化模型有效地增加了建筑流水施工的工作效率,应用效果良好。In view of the low efficiency of current flow construction sequence model, this paper put forward an optimized model based on interval time and flow space. It firstly optimizes the interval time for two cases of segmentation with and without separated layer. Then a flow construction optimization model is established based on flow space in order to reduce the construction period as much as possible. The simulation experiments show that the proposed model based on interval time and flow space is efficient in building flow construction and has better performance.

关 键 词:间歇时间 流水步距 流水施工优化 施工排序 

分 类 号:TU72[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象