筒仓群工程分区段滑模施工技术  被引量:2

Divisional slip-form construction technology for silo group project

在线阅读下载全文

作  者:王本猛[1] 

机构地区:[1]煤炭工业济南设计研究院有限公司,山东济南250031

出  处:《煤炭工程》2016年第2期53-55,共3页Coal Engineering

摘  要:为实现筒仓群分区段施工,达到减少施工周期的目的,以新矿公司洗煤厂筒仓群中的3号仓(第二区段)的分区段施工为背景,分析研究了分区段滑模施工的工艺,并通过改进液压滑模系统,将滑模的操作平台改造成悬吊平台,在支撑杆的基础上增加吊杆、滑轨和滑轮等技术措施保证分区段滑膜技术顺利施工。实践结果表明,采用分区段滑模技术可以大幅缩短工期,达到了预期的效果。To realize divisional construction of silos group, and shorten construction period, the paper took the construction practice in a coal preparation plant as engineering background,studied the divisional slip form construction technology,through the improvement of hydraulic slip form system,the slid form operation platform was transformed into suspension platform,besides the support rod,boom,slide rail and a pulley and other technical measures were applied to ensure the smooth construction of divisional slip- form technology. The practical results show that,the construction period is significantly shortened,achieving expected effect.

关 键 词:选煤厂 筒仓群 分区段滑模 液压滑膜系统 悬吊平台 

分 类 号:TD223[矿业工程—矿井建设] TU755.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象