检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄元生[1] 李鹏[1,2] 严福章[3] 王彦兵[3]
机构地区:[1]华北电力大学,河北保定071003 [2]国家电网公司,北京100031 [3]国网北京经济技术研究院,北京102209
出 处:《中国电力》2016年第2期84-89,共6页Electric Power
摘 要:由于青藏高原多年冻土恶劣的工程地质条件,给青藏直流联网工程建设和运营带来了巨大的技术和经济难题。对工程沿线不同冻土类型、不同杆塔基础型式以及有无热棒处理措施的8个地段、10个基塔进行了地温和变形监测,并基于监测结果,分析了冻土地区杆塔基础地温和变形的变化规律和影响因素,预测了其在全球气候变暖条件下的长期稳定性,为冻土区杆塔基础的设计和稳定性研究提供基础数据。Due to the bad engineering geological condition of permafrost regions in the Qinghai-Tibet Plateau, immeasurable economic and technical problems are brought for Qinghai-Tibet DC transmission engineering. Ground temperature and deformation of eight sites and ten tower foundations with different soil types and foundation forms and thermal probes treatment were monitored and measured, the change laws and influential factor of ground temperature and deformation for tower foundation is analyzed, and also long-term stability is predicted in this paper based on the monitoring results, which provides data for design and stability analysis of tower foundation in permafrost regions.
关 键 词:青藏直流联网工程 多年冻土区 杆塔基础 地温 变形
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.199