检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡浩[1]
机构地区:[1]新疆水利水电勘测设计研究院,乌鲁木齐830000
出 处:《广西水利水电》2016年第1期57-59,共3页Guangxi Water Resources & Hydropower Engineering
摘 要:针对克孜尔水库泥沙淤积问题,提出了堤渠联合辅助排沙系统。系统实施后达到了干支流路径分离的目的,改善了水流环境,增强水流挟沙能力,缩短支流黑孜河的泥沙运行路径,从而使得支流高含沙水流形成的异重流更易于到达坝前。从人工辅助系统实施前2007年及系统实施后2011年黑孜河异重流的输沙数据对比分析的结果表明:系统实施后缩短了挟沙水流运行距离和库区传播时间缩短,增大了出库沙量,减少了水库泥沙淤积,延长水库寿命,效果显著。In view of the sedimentation problem of Kezier Reservoir in Xinjiang Uygur Autonomous Region, thedike-canal joint desilting system was put forward. After the system was constructed, trunk streams and tributariesare separated; flow environment is improved; silt-carrying capability of water flow is strengthened; silt route ofHeizi tributary is shortened, so it becomes easier for the density current in tributary with high silt content to reachthe main dam. The sediment discharge data of 2007 and 2011, respectively before and after the construction ofdike-canal joint desilting system, had been compared and the results demonstrate that after the construction,thetravel distance and time of silt-carrying flow in reservoir area are shortened;sediment discharge from the reservoirincreases;sedimentation in reservoir decreases;and the service life of reservoir is prolonged with significant bene-fits.
分 类 号:TV145.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7