双锲金属铰接顶梁临时支护在掘进巷道中的应用  

Application of double woven metal articulating roof temporary support in roadway mining

在线阅读下载全文

作  者:陈福印 谷凯传 

机构地区:[1]峰峰集团大淑村矿,河北武安056300

出  处:《煤炭与化工》2016年第1期121-123,共3页Coal and Chemical Industry

摘  要:针对大淑村矿174404工作面上半段配巷掘进期间沿断层前进顶板凹凸不平,前探梁临时支护无法组织有效的快速掘进的问题,经过现场实践和理论论证,决定采用支护强度大的双锲金属铰接顶梁临时支护方式。实践表明,双锲金属铰接顶梁配合液压点柱的临时支护方式非常有效,与前探梁临时支护相比,在顶板破碎、不平时使用效果尤为突出,既有效支护了顶板,又提高了掘进效率,对掘进工作面快速掘进具有积极的借鉴意义。Based on the unsmooth in roof, the temporary support of front leaning beam without the ability to support rapid mining in 174404 upper section auxiliary roadway mining of Dashucun Mine, double woven metal articulating roof temporary support was set up through field practice and theoretical argument. The practice showed that the support technology was effective, especially effective when roof broken and uneven via front leaning beam support, the technology not only supported the roof, but also improved the mining rate, with significance to rapid mining in working face.

关 键 词:双锲金属铰接顶梁 液压点柱 临时支护 快速掘进 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象