机构地区:[1]内蒙古科技大学矿业研究院,内蒙古包头市014010 [2]内蒙古东升庙矿业有限责任公司,内蒙古巴彦淖尔市015543 [3]山西大同大学,山西大同市037009
出 处:《矿业研究与开发》2016年第2期39-42,共4页Mining Research and Development
摘 要:针对东升庙铅锌矿11号矿体800中段顶柱缓冲垫层设计,运用弹塑性碰撞理论对采空区冒落体与顶柱碰撞产生的冲击力进行计算,得到顶柱承受荷载,运用数值模拟方法对不同垫层厚度时的冒落荷载作用进行模拟分析,得到冒落荷载作用下的顶柱冲切失稳破坏机理,并得出合理垫层厚度为20m。研究结果为11号矿体进行冒落灾害防治提供了依据。Based on the cushion design for top pillar in 800 middle layer of the No. ll orebody in Dongshengmiao Leadzinc Mine, the impact force caused by the collision of falling blocks and top pillar in mined-out area was calculated by the theory of elastic-plastic collision. As a result, the load of top pillar was obtained. Then, numerical simulation was carried out on different thicknesses of cushion under various caving loads. Thus, the failure mechanism of top pillar under caving load was achieved, and the reasonable thickness of cushion was calculated as 20 m. The results provided reference to the prevention and control of caving disaster for the No. ll orebody.
分 类 号:TD853.391[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15