检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]School of Science, Changzhou Institute of Technology [2]Institute of Management Engineering, Shanghai Second Polytechnic University
出 处:《Chinese Quarterly Journal of Mathematics》2015年第4期524-531,共8页数学季刊(英文版)
基 金:Supported by the National Natural Science Foundation of China(70731160015);Supported by the National Natural Science Foundation of Jiangsu Province(yw06037)
摘 要:Scheduling with outsourcing is studied in this paper. It is assumed that both manufacturer and subcontractor have a single machine to process n jobs. The manufacturer needs to determine simultaneously a set of outsourced jobs and the schedule of the jobs in-house such that two criterias, i.e., outsourcing cost and production cost, are minimized.The production cost is measured by the number of tardy jobs or the total tardiness of jobs in-house, and the outsourcing cost is proportional to the total processing time of jobs outsourced. Two kinds of problems with different criterias are considered. We analyze the computational complexity and provide pseudo-polynomial time optimization algorithms for the NP-hard version of the problems.
关 键 词:SCHEDULING OUTSOURCING BICRITERIA
分 类 号:O224[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117