检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:CHEN Hua-yong CUI Peng CHEN Jian-gang TANG Jin-bo
机构地区:[1]Key Laboratory of Mountain Hazards and Earth Surface Process, CAS, Chengdu 610041, China [2]Institute of Mountain Hazards and Environment, CAS, Chengdu 610041, China [3]CAS Center for Excellence in Tibetan Plateau Earth Sciences, Beijing 100101, China
出 处:《Journal of Mountain Science》2016年第2期203-212,共10页山地科学学报(英文)
基 金:supported by the National Natural Science Foundation of China (Grant No.51209195);Foundation of Key Laboratory of Mountain Hazards and Earth Surface Process,Chinese Academy of Sciences,Science and Technology Service Network Initiative of Chinese Academy of Sciences (Grant No.KFJ-EW-STS-094);the Youth Foundation of the Institute of Mountain Hazards and Environment,CAS (Grant No.SDS-QN-1302)
摘 要:Debris flows are one of the common natural hazards in mountainous areas.They often cause devastating damage to the lives and property of local people.The sabo dam construction along a debris flow valley is considered to be a useful method for hazard mitigation.Previous work has concentrated on the different types of sabo dams such as close-type sabo dam,open-type sabo dam.However,little attention has been paid to the spillway structure of sabo dam.In the paper,a new type of spillway structure with lateral contraction was proposed.Debris flow patterns under four different spillway structures were investigated.The projection theory was employed to predict trajectory of debris flow out from the spillway and to estimate the incident angle and terminal velocity before it plunged into the scour hole behind the sabo dam.The results indicated that the estimated data were in good agreement with the experimental ones.The discrepancy between the estimated and experimental values of main parameters remained below 21.82%(relative error).Additionally,the effects of debris flow scales under different spillway structures were considered to study the scour law.Although the debris flow pattern and scour law behind the sabo dam under different operating conditions was analyzed in this paper,further study on the scour mechanism andthe maximum scour depth estimation based on scour theory is still required in the future.
关 键 词:Debris Flow SPILLWAY Sabo dam Flow trajectory VELOCITY SCOUR
分 类 号:P642.23[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.116